--->A gas-fired fire, ace %1"installation in a residential garage must be
installed as specified in the Hazardous Locations section of these
insm/etions,
--> The [:urnaee is not to be used %r tempora U heating of buildings or
structures under construction unless the furnace installation and
operation complies with the first CAUTION in the LOCATION
section of these instructions,
These fi.u'naces are shipped with the %llowing materials to assist in
proper furnace installation, These materials are shipped in the main
blower compartment,
Installer Packet includes:
Installation, Startup, and Operating instructions
Service and Maintenance instructions
User's Information Manual
Warranty Certificate
Loose Parts Bag includes: Quantity
Pressure tube extension 1
Collector Box or condensate trap extension tube 1
Inducer housing drain tube 1
1/2-in CPVC street elbow 2
Drain tube coupling 1
Drain tube coupiing grommet 1
Vent and combustion-air pipe support 2
Condensate trap hole filler plug 3
Vent and combustion-air intake hole filler ptug 2
Combustion-air pipe perforated disk assembly 1
Vent Pipe Extension 1"
* ONLY supplied with some furnaces.
e This forced air lurnace is equipped for use with natural gas at altitudes 0 - 10.000 ff (0 - 3,050m), except 140 size _rnaces are only approved for altitudes 0 - 7.000 ft.
(0 - 2,135m).
¢ An accessory kit, supptied by tbe manufacturer, shall be used to convert to propene gas use or rr_ay be required for some natural gas apptications.
o This furnace is for indoor installation in a building constructed on site. This furnace may be ins"tailed in a manufactiJred (mobile) home when stated on rating plate and
using factory authorked kit..
This furnace may be tilstalled on combustible floodng in alcove or closet at Minimum Inches Clearance To Combustible Construction as described below.
® This furnace requires a special venting system Refer to the installation instructions for parts list and method of installation. This furnace is for use with schedule-40 PVC.
PVC-DW%L CPVC. or ABS-DWV pipe, and must not be vented in common with other gas-tired apptiances. Construction tbrough which vent/air intake pipes may be
installed is maximum 24 inches (600 ram), minimum 3/4 inches (19 ram) thickness (including roofing materials)
e Cetta fournalse & air puls6 est 6quip6e peur utitisation avec gaz naturel et altitudes compdees entre 0 - 3.050m (0 - 10,000 pi),except6 queles fournaises de 140 taille
sont pour altitudes comprises entre 0 - 2,135m 0 - 7,000pi).
® Ut set une trousse de cenvers on. fourn e par e fabr can, pour passer au gaz propane ou pour certaines installations au gaz natureL
o Cetta fournaise a air puls6 es"t pour installation a Fint6rieur darts un bNiment construit sur place. Cetta fournalse a air pulse peut 6tre install6e dens une maison
pr6fabdqu6e (maison mobile) si prescht par la plaque signN6tique et si r on utitise une trousse specifi6e par le labdcant.
e C'etta fournaise peut _tre instati6e sur un plancher combustible darts un enfoncement ou un placard en observant les D_gagement Minimum En Pouces Ave¢
Elements De Construction Combustibles,
® Cetta fournaise n6cessite un systeme d'evaoJation special La m6thede d'installation et la tiste des pieces n6cessaires figurent dens les instructions d'instatiation. Cetle
fournalse doit s'u!itiser avec la tuyautede des nomendatures 40 PVC. PVC-DWV, CPVC, oN ABS-DVW et elle ne peut pas 6tre ventil6e conjointment avec d'autres
appereils a gaz. Epalsseur de la construction au travers de laquetie il est pcesible de laire passer les tuyaux d'a6ration (admlssion/6vacuation): 24 po ('600 ram)
maximum. 3/4 po (19ram) minimum (y cornprls la toiture)
For uptiow and downtiow applications, furnace mu_t be installed level, or pitched within 1/2" of level For a MIN 1/4" TO 1/2" MAX
horizontal apptication, the furnace must be pitched minimum 1/4" to maximum of 1/2" forward for proper
draina:je. See Installation Manual for IMPORTANT unit supped details on horizontal apptications,
Pour des appticatises de flux ascendent et descendant. _ fournaise ddt 8tre install6e de niveau ou indti%,e
pes plus de 1/2" du niveau. Pour une apptication hodzontale, la fournalse doit g,tre inciinde entre minimum
1/4" et maximum 1/2" du nNeau pour le drainage appropd6. En _ d'instatiation en position beCEontale.
consulter les renseignements tMPORTANTS sur le support dens le manuel d'instatiation. HORIZON TAL
NtNINUN iNCHES CLEARANCE TO CONBUSTtBLE CONSTRUCTION
ALL POSITIONS:
Minimum front clearance for service 24 inches (610mm),
? ? 140 size furnaces require 1 inch back clearance to combustible materials,
DOWNFLOW POSITIONS:
t For ir_stallation on cembustible floors only when installed on special base No, KGASB0201ALL,
Coil Assembly Part No, CD5 or CKS, or Coil Casing, Part No, KCAKC,
HORIZONTAL POSITIONS:
Line contact is permissible only between lines formed by intersections of top and two sides of
furnace jacket, and building joists, studs, or framing,
§ Clearance shown is for air inlet and air outlet ends.
O 120 and 140 size furnaces require 1 inch bottom clearance to combustible materials,
DEGAGEMENT MINIMUM EN POUCESAVEC _LEMENTS DE CONSTRUCTIONCOMBUSTIBLES
POUR TOUS LES POSITIONS:
Degagen_ent avant minimum de 610mm (24 po ) pour l'entretien,
tt Pourlesfoumaissede 140taille,1po(25mm)degagen-entdesn_t@iauxcombustiblseest
requis au-arriere.
POUR LA POSITION COURANT DESCENDANT:
1 Pour Iinstallation sur le plancher combustible seulement quand on utilise la base speciale, piece
n ° KGASB0201ALL, I'sesemble serpentin, piece n° CD5 ou CKS, ou le carter de serpentin,
piece n° KCAKC.
POUR LA POSITION HORIZONTALE:
Le contact n'est pem?is qdentre les ligses forages par les intersections du dessus et des
deuxoStes de la chemise de la foumaise et des selives, des n_ntan% ou de la charpente du
b4,timent,
§ La distance indiquee cenceme I'extr@mit6 du tuyau d'arrivde d'air et Fextremite du tuyau de sortie
d 'air,
Pour Ise foumaises de 120 et 140 taille 1 po (25ram) d&Jagement des mat@iaux combusitbles
est requis au<l_'ssous.
TNs furnace is approved for UPFLOW, DOWNFLOW aed
HORIZONTAL instNlations,
Cette toumaise est approuv¢e pour Iinstallaflon HORIZONTALE
e! la circulaJion d'air VERS LE HAUT et VERS LE BAS
Cleat_nce arrows
do not change with ne change pas avec
furnace onentation I'odentation de la
gen@aIeur d'air cbaud.
Vent clearance to
combustibles 0",
Clearance in inches 0 (po) Ocgagement
Degagetnent (po), d'@vent avec combustibles
3280_201 REV, B LITTOP
Fig. 3--Clearances to Combustibles
4
J
A04110