EasyManua.ls Logo

Carrier 58MVP120 User Manual

Carrier 58MVP120
48 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
58MVP
4-Way Multipoise Direct-Vent
Variable-Capacity Condensing Gas Furnace
Installation, Start-Up, and Operating Instructions
For Sizes 040—120, Series 140 and 150
This symbol indicates a change since the last issue.
Index Page
DIMENSIONAL DRAWING........................................................3
SAFETY CONSIDERATIONS.....................................................2
Clearances to Combustibles......................................................4
ELECTROSTATIC DISCHARGE (ESD) PRECAUTIONS........2
INTRODUCTION.......................................................................2-4
APPLICATIONS ......................................................................5-11
General ......................................................................................5
Upflow Applications..............................................................5-7
Downflow Applications.........................................................7-8
Horizontal Left (Supply-Air Discharge) Applications.......8-10
Horizontal Right (Supply-Air Discharge) Applications...10-11
LOCATION ............................................................................11-13
General...............................................................................11-12
Low-Fire Only Installation.....................................................13
Furnace Location Relative to Cooling Equipment ................13
Hazardous Locations...............................................................13
INSTALLATION....................................................................13-14
Leveling Legs (If Desired).....................................................13
Installation In Upflow or Downflow Applications ..........14-15
Installation In Horizontal Applications..................................14
AIR DUCTS............................................................................14-18
General Requirements.............................................................14
Ductwork Acoustical Treatment.............................................14
Supply-Air Connections..........................................................14
Return-Air Connections..........................................................14
Filter Arrangement ............................................................16-17
Bottom Closure Panel.............................................................17
Gas Piping..........................................................................17-18
ELECTRICAL CONNECTIONS...........................................18-22
115-v Wiring......................................................................18-19
24-v Wiring.............................................................................19
Accessories ........................................................................21-22
DIRECT VENTING ...............................................................22-31
Removal of Existing Furnaces from
Common Vent Systems.....................................................23
Combustion-Air and Vent Piping...........................................23
Concentric Vent and Combustion-Air Termination
Kit Installation..............................................................28-31
Multiventing and Vent Terminations.....................................31
CONDENSATE DRAIN ........................................................31-33
General...............................................................................31-32
Application..............................................................................31
Condensate Drain Protection..................................................31
SEQUENCE OF OPERATION..............................................33-36
Self-Test Mode........................................................................33
Heating Mode..........................................................................33
Heating Mode—Two Stage....................................................34
Emergency Heat Mode...........................................................34
Cooling Mode .........................................................................34
Heat Pump Mode...............................................................34-35
Continuous Fan Mode.......................................................35-36
Component Test......................................................................36
Bypass Humidifier Mode........................................................36
Dehumidification Mode..........................................................36
Zone Mode..............................................................................36
START-UP PROCEDURES ..................................................36-45
General ....................................................................................36
Select Setup Switch Positions ................................................37
Prime Condensate Trap With Water......................................37
Purge Gas Lines......................................................................38
Adjustments .......................................................................38-45
Set Gas Input Rate ............................................................38-44
Set Temperature Rise..............................................................44
A93040
NOTE: Read the entire instruction
manual before starting the installation.
ama
CERTIFIED
As an ENERGY STAR®
Partner, Carrier Corpora-
tion has determined that
this product meets the EN-
ERGY STAR® guidelines
for energy efficiency.
REGISTERED QUALITY SYSTEM
Fig. 1Multipoise Orientations
A93041
UPFLOW
DOWNFLOW
HORIZONTAL
LEFT
AIRFLOW
AIRFLOW
AIRFLOW
AIRFLOW
HORIZONTAL
RIGHT
Visit www.carrier.com
Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
Book 1 4
Tab 6a 8a
PC 101 Catalog No. 535-80021 Printed in U.S.A. Form 58MVP-11SI Pg 1 2-01 Replaces: 58MVP-10SI
Question and Answer IconNeed help?

Do you have a question about the Carrier 58MVP120 and is the answer not in the manual?

Carrier 58MVP120 Specifications

General IconGeneral
Model58MVP120
TypeGas Furnace
Heating Capacity120, 000 BTU/h
Blower TypeVariable Speed
Ignition TypeHot Surface Ignition
Warranty10-Year Parts Limited Warranty upon timely registration
StagesModulating
Fuel TypeNatural Gas
EfficiencyUp to 96.7% AFUE
IgnitionHot Surface Ignition
CategoryFurnace
Input BTU/h120, 000
Blower MotorVariable Speed

Summary

Safety Considerations

Electrostatic Discharge (ESD) Precautions

Precautions to protect electronic components from static discharge during installation and service.

Installation

Minimum Inches Clearance to Combustible Construction

Specifies required clearances from furnace to combustible materials.

Applications

Low-Fire Only Installation

Hazardous Locations

Air Ducts

Filter Arrangement

Gas Piping

Electrical Connections

Step 1-115-v Wiring

Field wiring instructions for the 115-v power supply and connections.

Step 2-24-v Wiring

Field wiring instructions for the 24-v thermostat and control connections.

Direct Venting

Step 2-Combustion-Air and Vent Piping

General requirements for combustion air and vent piping installation.

Step 3-Concentric Vent and Combustion-Air Termination Kit Installation

Instructions for installing vent and combustion-air termination kits.

Condensate Drain

Sequence of Operation

Step 2-Heating Mode

Step-by-step operation sequence for the heating mode.

Step 3-Heating Mode-Two Stage

Operation sequence for two-stage heating using a single-stage thermostat.

Step 5-Cooling Mode

Operation sequence for cooling mode (single and two-speed).

Step 6-Heat Pump Mode

Operation sequence for heat pump mode (single-speed).

Step 8-Component Test

Procedure for testing furnace components using the control center.

Start-Up Procedures

Step 2-Select Setup Switch Positions

How to set the furnace's internal setup switches for various configurations.

Step 4-Purge Gas Lines

Steps for purging gas lines and checking for leaks.

Set Gas Input Rate

How to set the gas input rate based on altitude and gas properties.

Set Temperature Rise

How to measure and adjust the air temperature rise across the heat exchanger.

Check Safety Controls

Step 1-Check Primary Limit Control

Procedure to test the primary limit control for overheating shutdown.

Step 2-Check Pressure Switches

Procedure to test the pressure switches for proper draft inducer operation.

Related product manuals