Checklist—Installation
LOAD CALCULATION
____________ Heating Load (Btuh)
____________ Cooling Load (Btuh)
____________ Furnace Model Selection
AIR FOR COMBUSTION AND VENTILATION
____________ Unconfined Space
____________ Confined Space
VENTING
____________ NFGC (United States)
____________ NSCNGPIC (Canada)
____________ Local Codes
____________ 1/4-in. Upward Slope
____________ Joints Secure
____________ See Attached Vent Table Instructions
CHECKLIST—START-UP
____________
Gas Input Rate
(Set Within 2 percent of Rating Plate)
____________ Temperature Rise Adjusted
____________ Thermostat Anticipator Setting Adjusted or
____________ Thermostat Cycle Rate (3 cycles per Hr) Selected
CHECK SAFETY CONTROLS OPERATION
____________ Primary Limit
____________ Pressure Switches
____________ Draft Safeguard Switch
____________ Auxiliary Limit Switch(es)
THERMOSTATS
____________ Manufacturer
____________ Model Number
Copyright 1999 CARRIER Corp. • 7310 W. Morris St. • Indianapolis, IN 46231 58uhv3si
Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
Book 1 4
Tab 6a 8a
PC 101 Catalog No. 535-731 Printed in U.S.A. Form 58UHV-4SI Pg 28 7-99 Replaces: 58UHV-3SI