CL-1
Start-Up Checklist
The following is a checklist to be completed before start-up:
1. General visual unit and system inspection Ye s No
2. Check that unit is level Ye s No
3. Record electrical supply voltage Ye s No
4. Check all wiring for secure connections Ye s No
5. Verify with straight edge alignment of motor and blower pulleys Ye s No
6. Tighten all set scews Ye s No
7. Confirm V-belt is properly tightened Ye s No
8. Check condensate drain connection Ye s No
9. Verify trap is deep enough Ye s No
10. Prime the trap with water Ye s No
11. Check supply and return water connections for leaks Ye s No
12. Fill systems with water by opening supply ball valve and control valve Ye s No
13. Open air vent on top of coil to vent air out of system Ye s No
14. Open return ball valve Ye s No
15. Engage power only long enough to verify proper blower rotation Ye s No
16. Check all ductwork and grilles in place Ye s No
17. Check all unit panels and filters in place Ye s No
18. Start fans, pumps, chillers, etc. Ye s No
19. Check for overload conditions of all units Ye s No
20. Check all ductwork and units for air leaks Ye s
No
21. Balance water systems, as required Ye s No
22. Balance air sytems, as required Ye s No
23. Record all final settings for future use Ye s No
24. Check piping and ductwork for noise or vibration Ye s No
25 Check all dampers for proper operation Ye s No
26. Verify proper cooling operation Ye s No
27. Verify proper heating operation Ye s No
28. Reinstall all covers and access panels Ye s No
29. Verify proper condensate drainage Ye s No