INITIAL START-UP CHECKLIST
FOR 19DV SEMI-HERMETIC TWO-STAGE CENTRIFUGAL LIQUID CHILLER
(Remove and use for job file.)
MACHINE INFORMATION:
DESIGN CONDITIONS:
REFRIGERANT: Type:
Charge
START-UP TO BE PERFORMED IN ACCORDANCE WITH APPROPRIATE MACHINE START-UP INSTRUCTIONS
JOB DATA REQUIRED:
1. Machine Installation Instructions Yes No
2. Machine Assembly, Wiring and Piping Diagrams Yes No
3. Starting Equipment Details and Wiring Diagrams Yes No
4. Applicable Design Data (see above) Yes No
5. Diagrams and Instructions for Special Controls Yes No
INITIAL MACHINE PRESSURE:
RECORD ACTUAL PRESSURE DROPS Cooler Condenser
CHARGE REFRIGERANT: Initial Charge Final Charge After Trim
NOTE: To avoid injury to personnel and damage to equipment or
property when completing the procedures listed in this start-up
checklist, use good judgment, follow safe practices, and adhere
to the safety considerations/information as outlined in preceding
sections of this Start-Up, Operation, and Maintenance Instruc-
tions document.
NAME SALES ORDER NO.
ADDRESS MODEL
CITY STATE ZIP S/N
TONS
(kW)
BRINE
FLOW
RATE
TEMPERATURE
IN
TEMPERATURE
OUT
PRESSURE
DROP
PASS
SUCTION
TEMPERATURE
CONDENSER
TEMPERATURE
COOLER ******
CONDENSER ******
CHILLER LINE SIDE: Volts FLA OLTA
CARRIER OBLIGATIONS: Disassembled at Job Site . . . . . . . . Yes No
Assemble... . . . . . . . . . . . . . . . . Yes No
Leak Test . . . . . . . . . . . . . . . . . . . Yes No
Dehydrate . . . . . . . . . . . . . . . . . . Yes No
Charging . . . . . . . . . . . . . . . . . . . Yes No
Operating Instructions
Hrs.
Add dose of Carrier Inhibitor (500 ppm) during initial commissioning. Yes No
YES NO
Was Machine Tight?
If Not, Were Leaks Corrected?
Was Machine Dehydrated After Repairs?