21. FINISHING INSTALLATION 
 
 FINISHING STEPS OF INSTALLATION  
 
 
(1) Tie together refrigerant piping, condensate drain hose, electrical cables. 
Form the refrigerant piping in the required direction and bind the condensate drain hose, electrical cables 
together with vinyl tape. 
 The condensate drain hose should be always at the bottom of lump to assure smooth drainage.  
  The lump must be of circular shape. 
  Fix piping with pipe clamps and check that any pipe vibrations cannot be transmitted to the building 
structure. 
 
 
 
 
 
 
 
 
 
 
(2) Fill the gap between the outside wall pipe hole and the piping with sealing wall 
sleeve, wall cap and sealer so that rain and wind cannot enter. 
 
 
 
 
 
 
 
 
(3) After completion of electrical wiring to the outdoor unit: 
 Fasten the electrical cables with the cable clamp. 
 Install again the service door. 
 
 
Side Discharge – Outdoor Unit