PF4MNA: Installation Instructions
Manufacturer reserves the right to change, at any time, specifications and designs without notice and without obligations.
2
A09392
Fig. 1 – Slope Coil Unit in Upflow Application
A07566
Fig. 2 – Slope Coil in Horizontal Left Application (Factory Configuration)
A00072A
Fig. 3 – A-Coil in Horizontal Left Application (Factory Configuration)
A COIL
UNITS
POWER ENTRY
OPTIONS
LOW VOLT
ENTRY
OPTIONS
FIELD MODIFIED
SIDE RETURN
LOCATION FOR
SLOPE COIL
UNITS ONLY
FIELD SUPPLIED
RETURN PLENUM
UPFLOW/DOWNFLOW
SECONDARY DRAIN
UPFLOW/DOWNFLOW
PRIMARY DRAIN
UNIT
018
019 - 031
A
12" (305 mm)
17" (432 mm)
A
1.5" (38 mm)
2.5"
(64 mm)
19" (483 mm)
FIELD SUPPLIED
SUPPLY DUCT
UPFLOW/DOWNFLOW
SECONDARY DRAIN
UPFLOW/DOWNFLOW
PRIMARY DRAIN
036/037 19" (483 mm)
018 - 049 21" (533 mm) FRONT SERVICE
060 - 061 24" (610mm) CLEARANCE
UNIT
FIELD
SUPPLIED
HANGING
STRAPS
LOW VOLT
ENTRY
OPTIONS
POWER
ENTRY OPTIONS
SECONDARY
DRAIN
018-048 21" (533 mm)
060-060 24" (610 mm)
FRONT SERVICE
CLEARANCE
(FULL FACE
OF UNIT)
SECONDARY
DRAIN
A-COIL
HORIZONTAL LEFT
PRIMARY
DRAIN
PRIMARY
DRAIN
1.75" (44 mm)
FILTER ACCESS
CLEARANCE
A
B
C
FACTORY SHIPPED
HORIZONTAL LEFT
APPLICATION
AIR SEAL
ASSEMBLY
HORIZONTAL
DRAIN PAN
REFRIGERANT
CONNECTIONS
SECONDARY DRAIN
HORIZONTAL LEFT
PRIMARY DRAIN
HORIZONTAL LEFT
COIL
SUPPORT
RAIL
COIL
BRACKET
DRAIN PAN
SUPPORT
BRACKET
COIL
BRACKET