PG92MSA: Installation, Start-up, Operating and Service and Maintenance Instructions
Manufacturer reserves the right to change, at any time, specifications and designs without notice and without obligations.
42
A11313A
DOWNFLOW VERTICAL
Fig. 55 – Downflow Configurations (Appearance may vary)
See “Notes for Venting Options”
A11327A
HORIZONTAL LEFT-VERTICAL VENT CONFIGURATION
A11328A
HORIZONAL LEFT-LEFT VENT CONFIGURATION
A11329A
HORIZONTAL LEFT-RIGHT VENT CONFIGURATION
Fig. 56 – Horizontal Left (Appearance may vary)
See “Notes for Venting Options”
A11337
HORIZONTAL RIGHT-VERTICAL VENT CONFIGURATION
A11336
HORIZONTAL RIGHT-LEFT VENT CONFIGURATION
A11335
HORIZONTAL RIGHT-RIGHT VENT CONFIGURATION
Fig. 57 – Horizontal Right (Appearance may vary)
See “Notes for Venting Options”
Notes for venting options
1. Attach vent pipe adapter with gasket to furnace casing.
2. Align notches in rubber coupling over standoffs on adapter. Slide
clamps over the coupling.
3. Slide vent pipe through adapter and coupling into vent elbow.
4. Insert vent pipe into vent elbow.
5. Torque all clamps 15 lb.-in.
6. Attach combustion air pipe adapter with gasket to furnace.
7. Attach combustion air pipe to adapter with silicone. Pilot drill
a1/8-in. hole in adapter and secure with a #7 x 1/2-in. sheet metal
screw.
Requires Accessory Internal Vent Kit.
See Product Data for current kit number.
Additional coupling required from
transition to polypropylene piping.