6028021 Rev. 1 7
NSTALLATION
I
Prepare Hoses or Install Hose Kits
A Position truck carriage behind roll clamp.
B Determine hose lengths required.
C Cut hoses to length, install end fittings and
connect hoses to truck supply terminals for
flushing.
3
INSTALLATION USING RH & LH 2-PORT
THINLINE
™
HOSE REELS:
RC0945.ill
RC0947.ill
RC0924 .ill
Clamp
INSTALLATION USING DOUBLE INTERNAL
HOSE REEVING:
CAUTION: Hoses should be 2300 psi working-
pressure rated for all attachment functions.
No. 8 hose is recommended for all functions.
Open
Flush hydraulic supply hoses
A Connect hoses together using union fittings
as shown.
B Operate auxiliary valves for 30 sec.
C Remove union fittings.
D IMPORTANT: Disconnect hoses from
supply terminals and connect to roll clamp
revolving connection end block fittings as
shown in Step 3 above.
4
RC0923.ill
INSTALLATION USING RH 2-PORT
THINLINE
™
HOSE REEL AND SINGLE
INTERNAL HOSE REEVING:
Revolving
Connection
End Block
Rotate CW/
Swing Retract
Clamp
Open
Rotate CW/
Swing Retract
NOTE: Revolving Connection end block may have either
LH or RH porting for the CLAMP and ROTATE/SWING
circuits (LH CLAMP circuits shown in following illustrations).
Rotate CCW/
Swing Extend
Rotate CCW/
Swing Extend
Clamp
Open
Rotate CW/
Swing Retract
Rotate CCW/
Swing Extend