SECTION 2 - OPERATION
2-17
Start tractor and lower the loader to the ground until
the attachment disengages from the loader tool
carrier.
Back tractor/loader away from attachment.
0182
35
INSTALL ATTACHMENT
Raise/lower the loader to make the base of the
attachment plate about 50 mm (2 in) from the ground.
Tilt the tool forwards slightly (using the bucket level
indicator as a reference).
NOTE: To improve visibility tilt the tool carrier
forward.
36
Drive the tractor forwards slowly to position the tool
carrier under the hooks on the attachment.
0151-a
37