SECTION 2 - OPERATION
2-23
Lift the load carefully, keeping the bucket level. Raise
loader only enough for clearance under bale. Move
bale slowly and carefully until ready to unload.
IMPORTANT: Always roll back bucket if bale is to be
lifted more than 152 mm ( 6 in) abov e ground lev el.
47
Release bale as close to the ground as possible.
Partially dump bucket while slowly opening grapple.
Carefully back unit away from bale.
48