SE15 OPERATIONS MANUAL & PARTS LIST (Rev. 8/2020)
6. RUN THE UNIT IN “DISCHARGE” MODE. CHANGE THE PUMP-TO-TANK
HOSE TO DISCHARGE CONNECTION.
7. TURN SWITCH ON. THE PRESSURE READING SHOULD BE 5-7 PSI.
8. TURN SWITCH OFF. THE POSITIVE PRESSURE IN THE TANK WILL CAUSE
THE PUMP TO ROTATE BACKWARDS UNTIL THE PRESSURE EQUALIZES.
9. MACHINE IS READY TO USE.