ENGLISH
• CEDIMA
®
• Technical Documentation • All rights reserved as per DIN 34 • Subject to modifications due to progressive development •
5-2
Maintenance and care
5.4 Maintenance intervals table for the CEDIMA
®
joint cutter CF-12.4 E-TR
You will find the description of the maintenance work in the following and appropriate sections/chapters of this operating manual.
The table can be updated by CEDIMA
®
at any time (e.g. to comply with technical necessities and developments)! Please ask about
it at CEDIMA
®
!
before
each
start-up
after work
every
working
day
for the first
time after
10 operat-
ing hours
weekly
after 1
month
after 3–6
months
annually
on
distur-
bances
after
damages
entire machine
3 1 3 3
electrical systems
7 7 7 7 7 4
tool receptacle
flanges and blade
receptacle
1, 2 3 4
tool (diamond saw
blade)
3, 6 1 4
control elements
(hand crank, lever,
…)
3 1 4
V-belts
3 5 3 4 3 4
threaded spindle
2 3 4
motor housing
1
motor
3, 7
fixing brake
3 3, 5 4
accessible fixing
elements (nuts,
screws, …)
5
1 cleaning
2 lubricants, fats, oils, corrosion protection
3 control (optical, function)
4 exchange, replacing
5 retightening, adjusting
6 exchange if necessary
7 legal safety checks on electrical
systems (see table 1A and 1B)