EasyManua.ls Logo

CEM DT-9929 - Battery Installation Guide; Installing the Battery

CEM DT-9929
28 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
20
6. IF THE METER IS TO BE STORED FOR A LONG PERIOD OF
TIME, the batteries should be removed to prevent damage to the
unit.
BATTERY INSTALLATION
WARNING: To avoid electric shock, disconnect the test leads from
any source of voltage before removing the battery cover.
1. Turn power off and disconnect the test leads from the meter.
2. Open the rear battery cover by removing two screws (B) using a
Phillips head screwdriver.
3. Insert the battery into battery holder, observing the correct polarity.
4. Put the battery cover back in place. Secure with the screws.
WARNING: To avoid electric shock, do not operate the meter until
the battery cover is in place and fastened securely.
NOTE: If your meter does not work properly, check the fuses and
batteries to make sure that they are still good and that they are
properly inserted.

Related product manuals