Step 6: Connect the HOOK AND CHAIN (#27) to the end of the EXTENDIBLE BOOM by
putting the end link of chain through the oval hole and bolting it in place using its NUT
(#29) and BOLT (#28).Step 6: Connect the HOOK AND CHAIN (#27) to the end of
the EXTENDIBLE BOOM by putting the end link of chain through the oval hole and
bolting it in place using its NUT (#29) and BOLT (#28).
Step 7: Attach the GREASE FITTING (#3) to the POST as shown in Figure (6).
Figure 6 — Installing the Grease Fitting
Note:
Nut #29 has a threadless shoulder.
Pg. 6 -- SKU 1647