4 Installation, assembly information
Safety measures:
Installation and assembly must only be performed by specially trained and qualified personnel. The
general accident prevention regulations must thereby be observed.
A formal handover to the operator occurs in case of implementation by CGS or its authorised representatives.
The device can subsequently be properly operated according to the operating instructions and applicable
safety regulations.
Before opening the device, disconnect it from the power supply in any case.
Requirements for the installation site:
•No exposure to direct sunlight
•Low exposure to dust
•Sufficient space for operation and maintenance
•Available and easily accessible escape routes
•No tripping hazards caused by cables that run close to the ground, etc.
•Maximum height: 2000 m above sea level
Technical prerequisites (supply voltage, gas pressures, etc.) can be found in the Technical Data section.