EasyManua.ls Logo

Chapin 8200A - Assembly Instructions; Assembly Steps and Tools; General Operating Instructions; Spreader Operation Guide

Chapin 8200A
12 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CHAPIN INTERNATIONAL, INC. P.O. BOX 549 700 ELLICOTT ST. BATAVIA, NY 14021-0549 www.chapinmfg.com 800-950-4458
ASSEMBLY INSTRUCTIONS
Suggested Tools:
Wrench and/or Ratchet Set
Approximate assembly time is 5-10 minutes
Remove bottom bolt from each side of handle (below thumb nuts Figure A).
Loosen thumb nuts on top bolts (Figure B) and ip up handle.
Replace bolts below thumb nuts and tighten down.
Tighten all 4 thumb nuts completely.
Be sure gate control is in the closed position (do not hold bail down when lling)
Determine appropriate setting for material being used by reading the suggested setting on the materials bag AND/OR by referencing the
application chart on your spreader’s control panel (Charts provided are only guidelines. Be sure to read the instructions on the bag/box of the
material youre spreading to identify accurate setting needed)
Set the dial to the desired setting Important Note: Do not adjust dial while holding bail down and gate is open. is will alter the accuracy
of gate settings and cause parts to break.
To begin spreading, start walking (about 3 mph pace) and pull the bail system down to open gate
To stop spreading simply let go of the bail and the gate will close
GENERAL OPERATING INSTRUCTIONS
Figure C
* Note: If spring detaches from bail assembly, simply re-attach (see Figure C).
Completed
Assembly
Figure B
Figure A

Other manuals for Chapin 8200A

Related product manuals