Instruction Manual EN
CP COMPRESSOR
Model CPF 175 - 200
CPVS 200 - 250
62 305 799 65
CPVS 250
CPF 200

Table of Contents

Questions and Answers

Summary

Chapter 2 - Installation

B - Room

Requirements for the installation room, including temperature, ventilation, and air supply.

E - Electric cabling

Details on wiring, voltage requirements, motor guarantees, and safety regulations for electric connections.

Chapter 3 - Commissioning

A - Preparation for start-up

Pre-start checks including earthing, oil level, drainage valve, and transport wedges.

B - First start-up

Procedures for checking voltage, rotation direction, and initial run observations.

E - Safety

Safety precautions regarding combustible oil and appropriate fire extinguishers.

Chapter 4 - Operation

A - Air and oil circuits

Description of the air and oil circuits, detailing the path of air and oil through the system.

Regulation Principles

Chapter 6 - Specific Information for CPVS 200 - 250

B - Safety

Safety rules and warnings specific to CPVS machines, especially regarding inverters.

Commissioning for CPVS Models

1 - Preparation for start-up

Pre-start checks for commissioning, including earthing, oil level, and blocking lugs.

2 - Control of rotation direction on start up

Procedure to check and correct motor and fan rotation direction on initial start-up.

3 - Setting of pressure - machine

Guidance on setting delivery and stop pressures for optimal energy saving.

5 - Regulating the pressure by changing the speed

Method of regulating pressure by adjusting motor speed via the AIRLOGIC controller.

Operating Incidents

Chapter 7 - Maintenance

A - Oil level and change

Detailed instructions on checking and changing the compressor oil, including oil type and flushing procedures.

F - Oil separator

Guidelines for changing the oil separator, including disassembly and reassembly steps.

Chapter 8 - Trouble shooting

Summary

Chapter 2 - Installation

B - Room

Requirements for the installation room, including temperature, ventilation, and air supply.

E - Electric cabling

Details on wiring, voltage requirements, motor guarantees, and safety regulations for electric connections.

Chapter 3 - Commissioning

A - Preparation for start-up

Pre-start checks including earthing, oil level, drainage valve, and transport wedges.

B - First start-up

Procedures for checking voltage, rotation direction, and initial run observations.

E - Safety

Safety precautions regarding combustible oil and appropriate fire extinguishers.

Chapter 4 - Operation

A - Air and oil circuits

Description of the air and oil circuits, detailing the path of air and oil through the system.

Regulation Principles

Chapter 6 - Specific Information for CPVS 200 - 250

B - Safety

Safety rules and warnings specific to CPVS machines, especially regarding inverters.

Commissioning for CPVS Models

1 - Preparation for start-up

Pre-start checks for commissioning, including earthing, oil level, and blocking lugs.

2 - Control of rotation direction on start up

Procedure to check and correct motor and fan rotation direction on initial start-up.

3 - Setting of pressure - machine

Guidance on setting delivery and stop pressures for optimal energy saving.

5 - Regulating the pressure by changing the speed

Method of regulating pressure by adjusting motor speed via the AIRLOGIC controller.

Operating Incidents

Chapter 7 - Maintenance

A - Oil level and change

Detailed instructions on checking and changing the compressor oil, including oil type and flushing procedures.

F - Oil separator

Guidelines for changing the oil separator, including disassembly and reassembly steps.

Chapter 8 - Trouble shooting

Chicago Pneumatic CPVS 250 Specifications

General IconGeneral
BrandChicago Pneumatic
ModelCPVS 250
CategoryAir Compressor
LanguageEnglish

Related product manuals