EasyManua.ls Logo

Chord Etude - Connecting Étude to ancillary equipment

Chord Etude
26 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chord Electronics
Étude | Manual
_
When connecting the Étude to
equipment within the signal path,
ensure all devices are switched
o. It is recommended that
once all equipment is properly
connected, that the volume
setting is operated to its lowest
setting, before slowly being
raised to a comfortable listening
level. Always observe partnering
manufacturers’ guidelines.
4.1 Placement
4.2 Connecting Étude to
ancillary equipment
4.3 Line level inputs
4.4 Audio outputs
4.5 Power-on sequence
4.6 Earthing issues in Europe
Connecting Étude to ancillary
equipment
4.2
18 // 26

Other manuals for Chord Etude

Related product manuals