EasyManua.ls Logo

Christie CC2 - Final Alignment and Commissioning

Christie CC2
40 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation Manual 6838_05
19Installation |
2.2 Installation
STEP 5
Ensure the appliance aligns with the edges of the benchtop. Tighten the wing nuts so that
the appliance does not move at all.
STEP 6
To Commission connect the power supply and turn the mains power on.
Press the START/STOP button for 6 seconds and run a full preheat and cooking cycle,
which takes approximately 25 minutes. To ensure correct operation see Chapter 3 of
this manual. This test should be conducted with the access door closed, to ensure
sufficient ventilation.
Important: An audible beep must be heard upon connecting to the electrical circuit. If you
do not hear an audible beep, please check the troubleshooting guide in this manual.