EasyManuals Logo

Cisco Firepower 2120 User Manual

Cisco Firepower 2120
62 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #61 background imageLoading...
Page #61 background image
Step 2
Install the cable management/rack bracket to the chassis by Installing three 8-32" screws through the rack mount bracket
on each side of the chassis.
Figure 32: Installing the Rack Mount Bracket to the Chassis
What to Do Next
Continue with installing the chassis in the rack. See Rack-Mount the Chassis, on page 33.
Cisco Firepower 2100 Series Hardware Installation Guide
57
Maintenance and Upgrades
Install the Optional Cable Management Brackets

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Cisco Firepower 2120 and is the answer not in the manual?

Cisco Firepower 2120 Specifications

General IconGeneral
Form Factor1RU
Memory16 GB
Operating Temperature32 to 104°F (0 to 40°C)
Maximum Concurrent Sessions2, 000, 000
Maximum Connections2 million
Management Ports1 x 1G management port
Storage480 GB SSD
Power SupplyDual, hot-swappable power supplies
Interfaces8 x 1GE, 8 x 1GE SFP

Related product manuals