Installation Operation Maintenance Manual
BIRM WS1 NOV 2007 \page
CONTENTS
NOS. PAGE
1.0 UNPACKING AND PARTS IDENTIFICATION 4
1.1 Unpacking Notes 4
1.2 Basic Parts List 4
1.3 Missing or Damaged Goods 4
2.0 TEMPORARY STORAGE 4
3.0 GENERAL NOTES 5
3.1 Iron & Manganese Removal 5
3.2 System Management 5
3.3 Birm Frequently Asked Questions 6
4.0 REGENERATION/BACKWASH
4.1 The Backwash Process 8
4.2 Time Clock Control of Backwash 8
5.0 PRE-INSTALLATION CHECKS
5.1 Mechanical 9
5.1.1 Foundations/Drainage 9
5.1.2 Operating Space 9
5.1.3 Incoming Water 9
5.1.4 Pipework 10
5.1.5 Water Supply Company Requirements 10
5.2 Electrical 10
6.0 ASSEMBLY/INSTALLATION 11
6.1 Mechanical 11
6.1.1 Pipework 11
6.1.2 Drains Connections 11
6.2 Assembly 12
7.0 COMMISSIONING 14
7.1 Introduction 14
7.2 Programming 14
7.3 Commissioning 17