Installation and
operating manual
Air cooled heat pump for external installation

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the CLIVET WSAN-XIN 20.2 and is the answer not in the manual?

CLIVET WSAN-XIN 20.2 Specifications

General IconGeneral
CategoryHeat Pump
ModelWSAN-XIN 20.2
RefrigerantR410A
Operating Temperature Range (Cooling)46°C
Power Supply400V/3Ph/50Hz

Summary

General Description

Manual

Provides instructions for correct unit installation, use, and maintenance.

Risk Situations

Details potential risks and the importance of qualified personnel for installation and maintenance.

Installation

Covers outdoor installation considerations and electrical line verification.

Maintenance

Advises on planning periodic inspection and maintenance to avoid costs.

Breakdown/Malfunction

Instructs to disable the unit immediately and contact a certified service agent.

User Training

Outlines the installer's role in training the user on unit operation and maintenance.

Positioning

Positioning

Details criteria for choosing installation places and avoiding airflow obstructions.

Water Connections

Water Quality

Details water quality features, acceptable values, and consequences of poor quality.

Recommended Connection

Details components and their positioning in the system for recommended connections.

Electrical Connections

Connections

Lists steps for making electrical connections, ensuring safety and proper procedure.

Connections Performer by Customer

Details input terminal connections for the unit in multiple languages.

Computer Connection

Guides on connecting a PC to the unit for configuration and monitoring.

Remote Control

Describes options for remote control unit interface and connection types.

Modbus - RS485

Details Modbus/RS485 communication options, cable requirements, and LEDs.

LonWorks

Explains LonWorks communication options, cable types, and specifications.

BACnet IP

Details BACnet IP communication options and related LEDs.

Start-up

Preliminary Checks

Lists checks to perform before starting up the unit, including safety precautions.

Start-up Sequence

Outlines the sequence of operations for unit start-up with power ON.

Refrigeration Circuit

Provides checks for the refrigeration circuit, including oil stains and pressure verification.

Water Circuit

Details checks for the water circuit, ensuring it's clean, filled, and pressurized.

Electric Circuit

Covers checks for grounding, conductor tightness, voltage, and phase balance.

Demand Limit

Explains how to access and set the demand limit parameter for power control.

Climatic Text

Details how to access and configure climatic text parameters for temperature control.

Water Reset

Explains how to access and configure water reset parameters affecting setpoint.

ECOSHARE Function for the Automatic Management of a Group of Units

Describes the ECOSHARE function for managing multiple units in a network.

Control

Modify Setpoint

Guides on accessing and modifying setpoint values for cooling and heating.

Scheduler

Describes how to set up weekly events for unit operation (Off, Eco, On, Recirculating).

Alarms

Provides instructions on identifying, resetting, and managing unit alarms.

General List of Alarms

Lists various electrical circuit alarms, their numbers, names, descriptions, and categories.

Maintenance

Inspections Frequency

Outlines recommended inspection frequencies and types based on unit usage.