EasyManua.ls Logo

Coldelite UC-113G/B User Manual

Coldelite UC-113G/B
35 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
UC-113G/B
Soft
Serve Freezer
DOUBLE FLAVOR COUNTER MODEL
OPERATION
&
SERVICE
3760
Industrial
Drive,
Winston-Salem,
NC
27105
.Telephone:. (91 9) 661-9893 Telefax:
(9.1
9)
661
-9895'
Telex:
7541 7OY"
Question and Answer IconNeed help?

Do you have a question about the Coldelite UC-113G/B and is the answer not in the manual?

Coldelite UC-113G/B Specifications

General IconGeneral
BrandColdelite
ModelUC-113G/B
CategoryFreezer
Defrosting SystemManual
Phase1-Phase

Summary

Foreword

Part I: Installation

Uncrating the Machine

Procedures for removing the machine from its shipping case and skid.

Positioning the Machine

Guidelines for placing the freezer on a counter, including clearance and leveling.

Water Cooled Condenser Connections

Instructions for connecting water-cooled models to water supply and drain.

Electrical Requirements

Details on voltage, amperage, fuse size, wiring, and grounding for electrical setup.

Completing the Installation

Final steps including sealing the machine to the counter and checking beater rotation.

Part II: Explanation of Controls

Selector Switch Operation

Explains the four positions (OFF, AUTO, ENERGY CONS, BEATER) of the selector switch.

Low Mix Level Indicator

Describes the indicator light and its function when mix levels are low.

Dispense Handle Function

Details how the dispense handles control product flow and activate the beater motor.

Electric Control Panel Overview

Introduces the control panel and warns about accessing it only by trained technicians.

Other Controls Explanation

Explains various other controls like solenoid valves and their functions.

Part III: Initial Cleaning Procedure

Mix Tank Component Disassembly

Removing the mix tank cover and items from the tank.

Gravity Feed Tube Disassembly

Removing and disassembling the gravity feed tubes.

Part IV: Assembling the Freezer

Beater/Auger Assembly

Step-by-step guide to reassembling the beater/auger components.

Dispensing Head Assembly

Lists parts and begins the process of reassembling the dispensing head.

Gravity Feed Tube Reassembly

Instructions for reassembling the gravity feed tubes with O-rings and sleeves.

Part V: Sanitizing the Freezer

Sanitizer Preparation and Application

Mixing sanitizer solution and filling tanks/cylinders.

Sanitizing Machine Operation

Running machine, brushing, and draining sanitizer.

Part VI: Starting the Freezer

Mix Preparation and Tank Filling

Preparing liquid mix and filling the mix tanks.

Cylinder Priming and Tube Installation

Priming cylinders with mix and installing gravity feed tubes.

Gravity Feed Tube Adjustment

Adjusting the gravity feed tube sleeve for production rate.

Final Fill and Machine Activation

Filling tanks, setting to AUTO, and initial freeze-down.

Part VII: Operating the Freezer

Product Dispensing

How to dispense product and create a tapering tower.

Part VIII: Routine, Periodic Cleaning Procedures

Preparation for Routine Cleaning

Removing feed tubes, softening product, and preparing for wash.

Washing and Rinsing Cycle

Filling with water/detergent and performing rinse cycles.

Brushing and Final Draining

Brushing surfaces and draining all water.

Part IX: Technical Information

Refrigeration System Details

Compressor, pressure, cooling system, and refrigerant information.

Beater Motor & H.O.M. System

Beater motor specs, H.O.M. system, and product temperature adjustment.

Drive System Operation

Explains the belt drive system and spigot switch operation.

Front Micro Switch Calibration

Details how to adjust the front micro switch for proper beater motor activation.

Trouble Shooting Guide

Wiring Diagram

Parts Identification

Related product manuals