EasyManua.ls Logo

Coleman FlowClear 90402E - Installation and Pedestal Fixing; Filter Pump Installation Steps; Pedestal Fixing Guidelines

Coleman FlowClear 90402E
8 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3 4
PEDESTAL FIXING
The filter pump must be vertically fixed on ground or a certain pedestal made of wood or concrete before use. There should be two
holes 9mm in diameter on the pedestal, the space between which should be 166mm. Put filter pump on the pedestal and fix them
together by fasten the bolts and nuts. All the pedestal parts should weigh over 18kgs at least to prevent the pump from accidentally
falling.
390
166
390
250
166
2-M8 bolt
2-M8 nut
1 2
B
A
P6019
P6019
B
A
A
B
A
B
A
B
B
A
P61318 P6680
B
A
P6124
5
S-S-004232

Related product manuals