EasyManuals Logo

Coleman Quickbed Instructions For Use

Coleman Quickbed
2 pages
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #2 background imageLoading...
Page #2 background image
To Insert/Replace Batteries
Make sure pump is “OFF”.
Press up on latch to open battery cover (Fig. 1).
Fig. 3
Push Here
MP3 Cord Storage
Insert 4 “D” cell batteries as shown. Make sure batteries are
installed in the correct orientation following the + and - symbols
(Fig. 2).
To Operate MP3 Plug In
Make sure pump is “OFF”.
Open battery cover and pull jack cord from storage slot (Fig. 2).
Close battery cover, making sure the cord exits the battery cover
in the upper, right cover (Fig. 3).
Push Here
MP3 Cord Storage
SPEAKER
ON/OFF
Fig. 1
MP3 Cord Storage
SPEAKER
ON/OFF
Fig. 2
Close the battery cover, making sure it is latched.
NOTE: Alkaline batteries are recommended for optimum
performance. Do not mix battery types. Do not mix old &
new batteries.
Plug cord into headphone jack on any CD player, MP3 player or
other audio device.
Press SPEAKER ON/OFF button to turn on the amplifier.
Volume is controlled using your device controls, not
the pump.
To Set Date, Time & Alarm:
Fig. 4
Press “MODE” to select Date, Time, Alarm, Chime (Fig. 4).
Press “SET” to enter setting mode for desired selection (Fig. 4).
Use “ ” to adjust Date, Time, Alarm and Chime (Fig. 4).
Press “MODE” to save setting (Fig. 4).
To Remove Clock:
Press on side hinges of clock and remove (Fig. 4).
Double Lock™ Valve Operation
CAUTION: Air temperature and weather do affect the air
pressure in inatable products. In cold weather your airbed will
lose some pressure due to the fact that the air will contract.
If this occurs, you may want to add a little air to improve your
airbed’s performance. However, in hot weather, the air will
expand. You must let some air out to prevent the airbed from
failing due to overpressure. You should avoid exposing your
airbed to extreme temperatures (hot or cold).
To Open Valve
Open - Step 1:
Internal Seal Closed
Pull open cap.
Open - Step 2:
Fully Opened Valve
Firmly pull cap to unseat valve from
inner yellow post.
Internal
Yellow
Post
Pull to Open
To Close Valve
Push to Close
Internal Seal Closed
Reverse Steps 1 & 2. Make sure valve
seats on inner yellow post.
Fully closed Valve
Close cap.
Important Things You Should Know
Carefully inspect the pump for damage before first use and every
use thereafter. Do not use if found damaged.
Keep unit out of reach of children.
Do not expose to rain or sunlight. Household use only.
Warnings
Follow the instructions carefully on articles to be inflated, never
exceed recommended pressure. Bursting items can cause
serious injury.
Do not open case, electrical hazards may result. There are no
user serviceable parts.
Do not use under wet conditions. Keep away from water.
Do not use or place near heaters, open flame or other
hot objects.
Never look into or point any opening toward your eyes while
pump is operating.
Do not attempt to put any objects into the inflation or deflation
port at any time.
Never leave pump unattended while in use.
Never allow sand, paper, debris or small articles to be sucked
into pump while operating.
• DO NOT BLOCK THE AIR VENTS DURING OPERATION, THIS
COULD DAMAGE THE MOTOR.

Other manuals for Coleman Quickbed

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Coleman Quickbed and is the answer not in the manual?

Coleman Quickbed Specifications

General IconGeneral
TypeAirbed
MaterialPVC
Carry Bag IncludedYes
PumpYes
Size OptionsTwin, Queen
Weight CapacityUp to 600 lbs
Inflation TimeApprox. 2 minutes
Pump IncludedYes
Pump Power SourceAC outlet
SizeVaries by model (Twin, Full, Queen, King)
Pump TypeBuilt-in electric pump
DimensionsTwin: 73 x 38 x 18 inches, Queen: 80 x 60 x 18 inches

Related product manuals