EasyManua.ls Logo

Compac CNG

Default Icon
125 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Scheduled Servicing
Servicing
Compac Industries Ltd.
Page 42
www.compacngv.com
Checking Dispenser Operation
To check that the dispenser is operating correctly:
1. Fill two gas bottles.
2. Check that:
The bottles fill to the desired pressure.
The dispenser fills to the preset value.
The displays and gauges are working
Checking the Sealing of the Solenoid
De-gas the hose by opening the 3 way
valve.
When the hose is empty check that the flow
has stopped. If the flow does not stop, the
seals in the final stage solenoid will need to
be replaced. (see page 48)

Table of Contents

Other manuals for Compac CNG

Related product manuals