EasyManua.ls Logo

Compak E8 OD - Page 25

Default Icon
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ORIGINAL INSTRUCTIONS | Ref. quality process 002/03 | v. 07/01/2016 | K06307
24
For the models with micrometric Parallel system, before removing the grinding
adjustment collar ( ), rotate the grind point lock screw ( ) counterclockwise to
release it from a locked position (Fig. 11).
Rotate the grind regulator clockwise until it is completely unscrewed. Clean the
grind chamber and threads of the housing using a soft cloth and vacuum cleaner until
all of the oils and residue has been removed.
Make sure to put new food grade lubricant on the clean threading of the housing
and upper assembly. Insert the upper burr assembly into the grind chamber, and
turn counter clockwise. For positioning and mounting the grinding adjustment ( )
distinguishbetweenmodelswithatburrsandtheconicalburrmodels.

Related product manuals