Facility Room Preparations
Patient Rooms:
One single-gang 110v electrical outlet completed below ceiling tile level for each
camera
One Single Gang electrical Box for each Compumedics system low voltage wiring at
bedside*
Finished Drop Ceilings and baseboards
Furnishings in patient rooms: Bed, Night Stands, etc
Availability of ancillary devices (CPAP etc.)
Network Data cables pulled from control room to patient room and terminated*
Control Room:
Network Data cables pulled from Server to control room (where applicable)*
Audio, Video and Data cables pulled from patient room to control room and
terminated*
One Single Gang electrical box for each Compumedics system low voltage wiring*
Adequate power outlets for each system
Computer ready furnishings set up in room
Copy of Certificate of Occupancy (when applicable) sent to Compumedics USA, Inc.
*Unless otherwise purchased at time of sale.