Testing the Meter Installation and Sealing the Device
To test the installation:
1. Ensure that the Meter is correctly installed.
2. Apply power to the meter by closing the upstream breaker.
3. Check that the meter is displaying the available credit in kWh. If a zero balance is
displayed, a credit token needs to be purchased and entered into the meter using the
keypad.
4. Enter #100# on the keypad to view the meter serial number.
5. Compare the meter number displayed to the serial number printed on the meter label
and card, to confirm that the numbers match.
6. Turn on an appliance or light in the consumer's premises, to ensure that the consumer
has electricity. In some cases, meter commissioning may be required. For more
information, see the Commissioning the meter section
7. If the meter is working correctly, hand over the meter card and user guide to the
consumer.
Cabling Specifications
Cable
Size
Live wire
Max
16
mm
2
Neutral wire
Max
16
mm
2
Type
Copper
Wire insertion depth into terminal
block
12mm
Wire to be stripped with at least 12mm of
conductor contracting the terminals
Securing torque (cable onto terminal block)
2Nm

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Conlog BEC21 and is the answer not in the manual?

Conlog BEC21 Specifications

General IconGeneral
BrandConlog
ModelBEC21
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals