EasyManua.ls Logo

Constructor P90 - Inspecting the Racking

Constructor P90
12 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
© Constructor 2020 9
All material handling equipment must be inspected regularly and according to DS-EN 15635.
Visual inspection:
quote DS-EN15635
The person responsable for warehouse safety must see to it that
regular inspections are carried out weekly, or with other regular
intervals based on a risk assessment. Each inspection must be
documented in writing, and all reports must be led.
Expert inspection:
quote DS-EN 15635
An expert must carry out an inspection at least every 12th month.
A written report must be handed over to the person responsable for
the warehouse safety, including observations and proposals for any
potential improvements.
Safety review: A safety review must always be carried out in connection with a
change in load levels or other reconstruction. This is to secure that the
data from the load signs are still valid.
If you have any questions, please contact your local representative. Buyer or user is responsible
for above inspections to be carried out. When repairing pallet racking, damaged supporting parts must
be replaced.
Inspecting the racking