4 P90 Pallet racking | Installation manual
Guidelines bracing Tox beam upright depth Box beam upright depth
Bracing/total length Short side handling
depth 1037 mm
Long side handling
depth 737 mm
Short side handling
depth 1100 mm
Long side handling
depth 800 mm
1 - Horizontal L= 967 mm 667 mm 1030 mm 730 mm
2 - Diagonal L= 1144 mm 908 mm 1198 mm 954 mm
3 - Diagonal L= 1264 mm 1056 mm 1313 mm 1096 mm
Upright installation
Uprights
Installation order:
Place the uprights with the
openings facing each other.
Install the horizontal and
diagonal bracing, starting in 3rd
slot (114 mm) from the bottom
(see bracing guidelines below).
Then install the foot plates in
lower slot (14 mm). Use screw
M10x70 mm and nut M10.
Make sure that all bolts are
well tightened.
h=7000
3
3
3
3
2
2
2
2
2
2
1
h=6500
3
3
3
3
2
2
2
2
2
1
h=6000
3
3
2
2
2
2
2
2
2
1
h=5500
3
3
2
2
2
2
2
2
1
h=5000
2
2
2
2
2
2
2
2
1
h=4500
2
2
2
2
2
2
2
1
h=4000
3
2
2
2
2
2
1
h=3500
3
2
2
2
2
1
h=3000
3
3
2
2
1
h=2500
3
3
2
1
h=2000
2
2
2
1
86
800
800
800
800
600
600
600
600
600
600
114
186
800
800
800
800
600
600
600
600
600
114
86
800
800
600
600
600
600
600
600
600
114
186
800
800
600
600
600
600
600
600
114
86
600
600
600
600
600
600
600
600
114
186
600
600
600
600
600
600
600
114
86
800
600
600
600
600
600
114
186
800
600
600
600
600
114
86
800
800
600
600
114
186
800
800
600
114
86
600
600
600
114
First and last bracing
with spacer (red)
Other bracing
A
A
A
A
A
B
B
B
B
B
B
B
B