MONTHLY TESTING BY CLIENT:
Repeat weekly testing.
Visually inspect fire barriers for damage.
Report any operation failures to the Fire Barrier Manufacturer / Supplier.
SIX MONTHLY TESTING BY MANUFACTURER OR CERTIFIED PERSONNEL ONLY:
• Repeat monthly testing.
• Check Power Supply Unit/s (PSU).
CAUTION 230Vac input voltage. Qualified personnel to BS 7671 IEE Wiring Regulations
only.
• Check all LED’s on Power Supply Unit.
• Charger Output.
• Voltage.
• Battery State.
• Inspect all fire curtains when in the down position for integrity of covers, abrasion, tears, stitching,
snagging etc.
• Ensure that all curtains are neat and tidy with no creases, puckering etc, re-align bottom bar where
necessary.
• Check condition of all bottom bars, Capping strips and their interface with the ceiling.
Check mechanical action in side guides etc. (Where applicable).
• Visual inspection of all visible wiring, connections, equipment for evidence of damage, wear, interference
etc.
• Rectify where necessary.
• If substantial work is required, beyond the scope of the inspection, survey the exact requirements, identify
cause, and take full details for report to Client.
• Leave “Call Report at site to advise client of situation.
ANNUAL P.P.M. TESTING BY MANUFACTURER OR CERTIFIED PERSONNEL ONLY:
• Repeat six monthly testing.
• Check roller head boxing and fixings; ensure roller is properly secured in position etc.
• Check operation of curtains under back up power and gravity fail-safe modes.
• Check and adjust ascent and descent speeds as required.
CAUTION 230Vac input voltage. Qualified personnel to BS 7671 IEE Wiring Regulations
only.
• Charger Outputs.
• 24Vdc Outputs.
• Replace all fuses with new. Destroy old fuses.
• Check battery condition, replace failed units.
• Re-calibrate all operating speeds.
• If substantial work is required, beyond the scope of the quarterly inspection, survey the exact
requirements, identify cause, and take full details for report to Client.
• Leave “Call Report” at site to advise client of situation.
24 MONTH TESTING BY MANUFACTURER OR CERTIFIED PERSONNEL ONLY:
Repeat annual testing.
Replace all Batteries.
CAUTION 230Vac input voltage. Qualified personnel to BS 7671 IEE Wiring Regulations
only.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Coopers Variospeed MK5 V3 and is the answer not in the manual?

Coopers Variospeed MK5 V3 Specifications

General IconGeneral
BrandCoopers
ModelVariospeed MK5 V3
CategoryController
LanguageEnglish