INSTALLATION
The total length of the entire hose set is limited to maximum 5 m. Place the drain hose lower
than the appliance. The height dierence between the drain hose and the appliance must not
exceed maximum 25 cm.
1
Close the feed water supply valve.
2
Connect the connection valve to the feed water supply valve.
3
Close the connection valve.
4
Attach the red hose to the
connection valve.
5
Open the feed water supply
valve.
6
Open the connection valve (6 c)
again and check the connection
for leaks.
7
Wash the lter with ambient water for 3 minutes in continuous dispensing mode.
8
Tap the hot button until water is dispensed from the faucet.
9
Tap the cold button until water is dispensed from the faucet.
For safe installation
Installation place
Do not install the water ltration system at a rough and dusty place,
a place where the unit is exposed to the direct sunlight or a damp
place where water drops from the roof or ceiling.
Cold water plumbing
Connect the device to the cold water pipe.
Connecting to warm water pipe might damage the lter.
Do not connect to the warm water supply under any circumstances.
Tap the ambient button. Then, set the desired
quantity of water (120 cc
→
250 cc
→
500 cc
→
continuous dispensing) by tapping quantity
button. Tap the dispense button to dispense
ambient water.
In area where the turbidity is high, install the external pre-lter (WJCF11-PRE-D)
before use.
- If not, the lter replacement cycle might be shorter than anticipated.
- The electric current (A) of multiple-tab connector should be over 12 A,
connect the product on a single tab.
Tips
HOW TO USE
To drink the room water