EasyManua.ls Logo

Curtis TLP12A - Programming Brew Volume; Adjusting Full Brew Volume; Adjusting Half Brew Volume

Curtis TLP12A
25 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PROGRAMMING GUIDE PG10
Changing the Full Brew Volume (Factory Default: 74oz./2.2L)
1 Turn the brewer on and wait for the BREW light to
come on solid.
2 Make sure the brew basket is empty and pushed
all the way in until it stops below the control
panel.
3 Turn off the control panel by pressing and
releasing the POWER button.
4 Press and hold the HALF BREW button. Press and release the POWER button.
5 Continue to hold down the HALF BREW button until the READY light TUBSUTUPnBTI, then release the HALF
BREW button.
6 1SFTTBOEIPMEUIF'6--#3&8CVUUPOVOUJMIPUXBUFSTUBSUTUPnPXUIFOSFMFBTF
7 8IFOUIFEFTJSFEWPMVNFJTSFBDIFEQSFTT'6--#3&8BHBJOUPTUPQUIFnPXBOETFUUIFCSFXWPMVNF
Changing the Half Brew Volume (Factory Default: 37oz./1.1L)
1 Turn the brewer on and wait for the BREW light to
come on solid.
2 Make sure the brew basket is empty and pushed
all the way in until it stops below the control
panel.
3 Turn off the control panel by pressing and
releasing the POWER button.
4 Press and hold the HALF BREW button. Press and release the POWER button.
5 Continue to hold down the HALF BREW button until the READY light TUBSUTUPnBTI, then release the HALF
BREW button.
6 1SFTTBOEIPMEUIF)"-'#3&8CVUUPOVOUJMIPUXBUFSTUBSUTUPnPXUIFOSFMFBTF
7 8IFOUIFEFTJSFEWPMVNFJTSFBDIFEQSFTT)"-'#3&8BHBJOUPTUPQUIFnPXBOETFUUIFCSFXWPMVNF
5-1130(3"..*/((6*%&ø /$
WARNING: These steps involve working with hot water. Avoid splashing and spilling.
WARNING: These steps involve working with hot water. Avoid splashing and spilling.
POWER
POWER

Related product manuals