15
Cybex FT-325 Owner’s Manual
Install individual weight plates one at at time
Position each weight plate so wide edges of bushings face upward and narrow edges 1.
of bushings face downward.
CORRECT
Wide bushing
edge faces upward
The narrow bushing edge
must face downward.
WRONG
Install lifting post.2.
Cable routing
Position pulley mount parallel to the top weight. 1.
Pull down on pulley mount until cable is tight.2.
Verify cable is still routed through all pulleys.3.
Attach pulley mount to lifting post using a hammer and spiral pin. 4.
Spiral
pin
Lift top weight up and down simulating normal operation (without selecting any resistance).5.
Verify the cable is moving smoothly.6.
Install back panels
Verify proper operation