EasyManua.ls Logo

CYBEX VR1 - Cable Routing Procedure

CYBEX VR1
40 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Cybex VR1 Owner’s Manual
Assembly
Page 4-4
Repeat steps 8A and 8B for each weight plate.C.
Carefully slide top weight (removed in step 7J) over guide rods.D.
9. Cable routing.
Verify cable is routed through top of pulley bracket and then route cable end to top weight A.
connector.
Pull cable tight and secure in place with roll pin removed in step 7H.B.
Place weight stack pin in each plate to verify proper installation.C.
Without selecting any resistance, lift top weight up and down (simulating normal operation).D.
Have an assistant verify that the cable is moving smoothly and is routed straight from the pulley E.
bracket to the top of the weight plate connector.
10. Install back shroud.
Carefully place shroud into position.A.
Secure top cap in place with the two BHSCS removed in step 7A.B.
11. Complete Steps 4 and 5.

Other manuals for CYBEX VR1

Related product manuals