EasyManua.ls Logo

Daikin AGZ-D User Manual

Daikin AGZ-D
46 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Installation and Maintenance Manual IM 1240-4
Group: Controls
Part Number: IM 1240-4
Date: September 2018
Supercedes: IM 1219
Intelligent Equipment
®
for Daikin

®
and Trailblazer
®
Air cooled Chillers,
Magnitude
®
Magnetic Bearing Chillers,
Rebel
®
and Maverick
®
II Commercial Packaged Rooftops,
RoofPak
®
Applied Packaged Rooftops and Outdoor Air
Handling Units
Models: AGZ-D, AGZ-E, AMZ, AWS, AWV, WMC,
DPS, MPS, RAH, RDS, RDT, RPR, and RPS
Question and Answer IconNeed help?

Do you have a question about the Daikin AGZ-D and is the answer not in the manual?

Daikin AGZ-D Specifications

General IconGeneral
BrandDaikin
ModelAGZ-D
CategoryChiller
LanguageEnglish

Summary

Introduction and Overview

Revision History

Records changes and updates to the manual over time.

Reference Documents

Lists other relevant Daikin manuals and resources for installation.

Limited Warranty Information

Outlines the warranty terms and conditions for Daikin equipment.

General Information

Provides an overview of the Intelligent Equipment solution and its capabilities.

Product Description

Details the Intelligent Equipment solution and its supported Daikin equipment models.

Hazardous Information Messages

Highlights safety warnings, cautions, and danger notices for safe operation.

Components Overview

Machine-to-Machine (M2M) Gateway

Describes the M2M Gateway, its function, and connectivity.

Antenna

Details the wireless antenna, its purpose, and mounting considerations.

Energy Management Module (EMM)

Explains the EMM's role in monitoring and transmitting unit data.

Current Transformers (CT's)

Describes the function and types of Current Transformers used for power measurement.

Power Supply Unit

Details the power supply required for the M2M Gateway and its specifications.

Fuse Block

Explains the fuse block's purpose for over-current protection of the EMM.

USB-to-Ethernet Adapter

Describes the adapter for connecting the M2M Gateway to a local area network.

Installation Procedures

Unpacking and Shipped Materials

Guides on how to unpack components and verify contents for installation.

Necessary Installation Tools

Lists the required tools for performing the installation of Intelligent Equipment.

Retrofit Installation Safety Precautions

Highlights critical safety measures and warnings during retrofit installations.

Chiller Installation Instructions

Provides specific steps for installing the M2M Gateway in chillers.

Installing Energy Management Module

Details the procedure for mounting and connecting the EMM within the unit.

Installing Power Supply

Outlines the steps for installing the power supply unit for the M2M Gateway.

Installing Fuse Block

Describes the process of installing the fuse block for EMM protection.

Control Cabinet Penetrations

Guides on creating openings in the control enclosure for cable routing.

Wiring and Interconnections

M2M Gateway Connections

Details how to connect the M2M Gateway to MTIII, WMC, and EMM.

Power Supply Connections

Explains how to connect the power supply to the M2M Gateway for different unit types.

EMM to CT Connections

Guides on connecting the EMM to split-core and Rogowski Coil CTs.

EMM to Line Voltage Connection

Describes connecting the EMM to line voltage via the fuse block.

M2M and EMM Ground Connection

Details the proper grounding procedure for M2M Gateway and EMM.

Antenna and Network Setup

Antenna Installation and Mounting

Covers the installation and proper mounting of the wireless antenna.

Wiring of Antenna

Details how to connect the antenna cable to the M2M Gateway.

LAN Installation and Connection

Guides on setting up a Local Area Network connection for the M2M Gateway.

Specific Unit Installation and Routing

Rooftop Installation Instructions

Provides installation steps specific to rooftop units.

Installing Mounting Brackets

Guides on installing mounting brackets for components on rooftop units.

Wire Routing Guidelines

Details best practices for routing wires safely within enclosures.

Connectivity Configuration

Wi-Fi Configuration

Step-by-step guide to configure the gateway for Wi-Fi connectivity.

Ethernet LAN Configuration

Step-by-step guide to configure the gateway for Ethernet LAN connectivity.

Commissioning and Verification

Commissioning the Gateway in the Cloud

Process for commissioning the Intelligent Equipment gateway with the cloud application.

Cellular Signal Verification

Procedure to verify cellular signal strength for the M2M Gateway.

Verify Time Zone Information

Steps to check and set the correct time zone for the gateway and controller.

Troubleshooting

Potential Issues and Solutions

Common problems and their resolution steps for Intelligent Equipment setup.

Appendix

Pre-Start-up Form

A form to be completed with IT staff for network connectivity setup.

Related product manuals