6 Finishing the outdoor unit installation
Installation manual
14
EPRA14~18DAV3+W1
Daikin Altherma 3 H HT
4P586100-1B – 2019.09
6 Finishing the outdoor unit
installation
6.1 To close the outdoor unit
NOTICE
When closing the outdoor unit cover, make sure that the
tightening torque does NOT exceed 4.1N•m.
6.2 To install the discharge grille
Install the lower part of the discharge grille
1 Insert the hooks.
2 Insert the ball studs.
3 Fix the 2 lower screws.
Install the upper part of the discharge grille
NOTICE
Vibrations. Make sure the upper part of the discharge
grille is attached seamlessly to the lower part to prevent
vibrations.
4 Align and attach the left side.
5 Align and attach the middle part.
6 Align and attach the right side.
7 Insert the hooks.
8 Insert the ball studs.
9 Fix the 6 remaining screws.