3 Unit installation
Installation manual
7
EPRA14~18DAV3+W1
Daikin Altherma 3 H HT
4P586100-1B – 2019.09
Use 4 sets of M12 anchor bolts, nuts and washers. Provide at least
150 mm of free space below the unit. Additionally, make sure the
unit is positioned at least 100 mm above the maximum expected
level of snow.
Anchor points
Pedestal
When installing on a pedestal, make sure that the discharge grille
still can be put in its safety position. See "6.3 To remove the
discharge grille, and put the grille in safety position"[415].
a Make sure not to cover the drain hole in the bottom plate of
the unit.
3.2.2 To install the outdoor unit
1 Carry the unit by its slings, and put it onto the installation
structure.
2 Fix the unit to the installation structure.
3 Remove the slings (and screws), and dispose of them.
3.2.3 To provide drainage
Make sure that condensation water can be evacuated properly.
NOTICE
If the unit is installed in a cold climate, take adequate
measures so that the evacuated condensate CANNOT
freeze. We recommend to do the following:
▪ Insulate the drain hose.
▪ Install a drain tube heater (field supply). To connect the
drain tube heater, see "5.3 To connect the electrical
wiring on the outdoor unit"[410].
NOTICE
Provide at least 150 mm of free space below the unit.
Additionally, make sure the unit is positioned at least
100mm above the expected level of snow.
Use the drain plug (with O-ring) and a hose for drainage.