EasyManua.ls Logo

Daikin Altherma 3 H HT W User Manual

Daikin Altherma 3 H HT W
36 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Installation manual
Daikin Altherma 3 H HT W
English
Installation manual
Daikin Altherma 3 H HT W
ETBH16DA6V
ETBH16DA9W
ETBX16DA6V
ETBX16DA9W
https://daikintechnicaldatahub.eu

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Daikin Altherma 3 H HT W and is the answer not in the manual?

Daikin Altherma 3 H HT W Specifications

General IconGeneral
TypeAir-to-Water Heat Pump
Energy Efficiency Class (Heating)A+++
Energy Efficiency Class (Cooling)A++
RefrigerantR-32
Maximum Flow Temperature70°C
Operating Temperature Range (Cooling)10°C to 46°C
Power Supply3-phase, 400V, 50Hz
Heating Capacity4.0 - 16.0 kW
Hot Water Tank Volume180 - 300 L

Summary

Unit Installation

Preparing the Installation Site

Details the requirements for the indoor unit installation site.

Installation Site Requirements of the Indoor Unit

Specifies the requirements for the indoor unit installation location.

Mounting the Indoor Unit

Step-by-step guide for mounting the indoor unit on the wall.

To Install the Indoor Unit

Details the process of installing the indoor unit.

Piping Installation

Connecting Water Piping

Instructions for connecting the water piping.

To Connect the Water Piping

Details the connection of water piping.

Electrical Installation

Connections to the Indoor Unit

Details various connections to the indoor unit.

To Connect the Main Power Supply

Instructions for connecting the main power supply.

To Connect the Backup Heater Power Supply

Steps for connecting the backup heater power supply.

To Connect the Shut-off Valve

Instructions for connecting the shut-off valve.

To Connect the Electricity Meters

Guide for connecting electricity meters.

To Connect the Domestic Hot Water Pump

Steps to connect the domestic hot water pump.

To Connect the Safety Thermostat (Normally Closed Contact)

Connecting the safety thermostat (NC contact).

Configuration

Configuration Wizard

Guide for initial system setup via the configuration wizard.

Configuration Wizard: Main Zone

Setting up the main heating/cooling zone parameters.

Commissioning

Checklist Before Commissioning

Pre-commissioning checks to ensure proper installation.

Checklist During Commissioning

Steps to perform during the commissioning process.

To Check the Minimum Flow Rate

Procedure to check the minimum flow rate.

To Perform an Air Purge

Steps to perform an air purge.

To Perform an Operation Test Run

Procedure for performing an operation test run.

Hand-over to the User

Related product manuals