5 Piping installation
Installation manual
20
EBSH/X(B)11+16P30+50DF
Daikin Altherma 3 R ECHO
4P663483-1A – 2021.11
dc
b a
a Space heating/cooling water OUT (screw connection, 1")
b Space heating/cooling water IN (screw connection, 1")
c Domestic hot water OUT (screw connection, 1")
d Domestic cold water IN (cold water supply)(screw
connection, 1")
NOTICE
It is recommended to install shut-off valves on the space
heating/cooling water in and out connections, as well as on
the domestic cold water in and domestic hot water out
connections. These shut-off valves are field supplied.
NOTICE
Install air purge valves at all local high points.
NOTICE
A pressure relief valve (field supply) with an opening
pressure of maximum 10 bar (=1 MPa) must be installed
on the domestic cold water inlet connection in accordance
with the applicable legislation.
5.4.2 To connect a pressure vessel
1 Connect a suitably dimensioned and preset pressure vessel for
the heating system. There may not be any hydraulic blocking
elements between the heat generator and the safety valve.
2 Position the pressure vessel in an easily accessible place
(maintenance, parts replacement).
5.4.3 To fill the heating system
DANGER: RISK OF ELECTROCUTION
During the filling process, water can escape from any
leaking point and can cause an electrical shock if it comes
into contact with live parts.
Before the filling process, de-energise the unit.
After the first filling and before switching on the unit
with the mains switch, check whether all electric parts
and connection points are dry.
1 Connect a hose with a non-return valve (1/2") and an external
manometer (field supply) to a water tap and the fill and drain
valve. Secure the hose against slipping off.
j/k
e.1
B
AB
A
e.2
50%
(45%)
100%
0%
CH
Bypass
(B) (A)
f
a
h
i
c
j
k
d
b
g
50%
(67%)
100%
0%
CH
DHW
(A)
(B)
a Hose with a non-return valve (1/2") and an external
manometer (field supply)
b Fill and drain valve
c Space heating/cooling water OUT
d Space heating/cooling water IN
e.1 Valve motor
e.2 Valve motor latch
f Water tap
g Automatic air purge valve
h Pressure gauge (field supply)
i Pressure vessel (field supply)
j Bypass valve
k Tank valve
2 Prepare for air purging according to the instructions (see
"8.2.2To perform an air purge"[445]).
3 Open the water tap.
4 Open fill and drain valve and monitor the manometer.
5 Fill the system with water until the external manometer shows
that the system target pressure is reached (system height +2m;
1m water column = 0.1bar). Make sure that the pressure relief
valve does not open.
6 Close the manual air vent valves as soon as water emerges
free of bubbles.