7 Installation
Installation and operation manual
25
EHYKOMB33A
Daikin Altherma hybrid heat pump – gas boiler module
4P353067-1H – 2018.10
≤250 mm
≤250 mm
≤250 mm
≤250 mm
≥3° (50 mm/m)
≤1000 mm
≤1000 mm
≤500 mm
A
B
A Second clamp after the second elbow
B First clamp after the second elbow
7.8 Finishing the gas boiler
installation
7.8.1 To close the gas boiler
1 Hook the top of the front panel into the top of the gas boiler.
2 Tilt the bottom side of the front panel towards the gas boiler.
3 Screw both screws of the cover.
4 Close the display cover.
7.8.2 To install the cover plate