EasyManuals Logo

Daikin FAQ71CVEB Installation Manual

Daikin FAQ71CVEB
30 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #28 background imageLoading...
Page #28 background image
English 27
CAUTION
Refer to “2. Items to be checked at time of delivery to customer” on page 4 upon completion of the test oper-
ation and make sure that all the items are checked.
If the customer’s interior work is not finished on completion of the test operation, tell the customer not to
operate the air conditioner.
Substances generated from paints and adhesives used for the interior work may contaminate the product
if the unit is operated.
When delivering the product to the customer after the test operation is completed, check that the control
box lid, the air filter and the suction grille are mounted. In addition, explain to the customer regarding the
state (ON/OFF) of the power supply breaker.
12. WIRING DIAGRAM
(Refer to Fig. 34)
1 TO OUTDOOR UNIT 2
(NOTE 10)
3(NOTE 4) 4
IN CASE OF SIMULTANEOUS
OPERATION SYSTEM
5 (NOTE 6) 6 INDOOR UNIT (MASTER)
7 INDOOR UNIT (SLAVE) 8 REMOTE CONTROLLER
9 (NOTE 8) 10
WIRELESS REMOTE
CONTROLLER (RECEIVER/
DISPLAY UNIT) (OPTIONAL
ACCESSORY)
11 INPUT FROM OUTSIDE 12
TRANSMISSION WIRING
CENTRAL REMOTE
CONTROLLER
13
(NOTE 5)
14
WIRED REMOTE CONTROLLER
(OPTIONAL ACCESSORY)
15 (NOTE 7) 16 FRONT
17 SIDE 18 CONTROL BOX
To test operation Contractors
3P184443-9J_FM6.book Page 27 Wednesday, December 14, 2011 10:29 AM

Other manuals for Daikin FAQ71CVEB

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Daikin FAQ71CVEB and is the answer not in the manual?

Daikin FAQ71CVEB Specifications

General IconGeneral
BrandDaikin
ModelFAQ71CVEB
CategoryAir Conditioner
LanguageEnglish

Related product manuals