EasyManua.ls Logo

Daikin FTXS20K2V1B - Part 8 Trial Operation and Field Settings

Daikin FTXS20K2V1B
184 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SiBE041134
Trial Operation and Field Settings 163
Part 8
Trial Operation and
Field Settings
1. Pump Down Operation........................................................................164
2. Forced Cooling Operation...................................................................165
3. Trial Operation ....................................................................................166
4. Field Settings ......................................................................................167
4.1 Model Type Setting ..............................................................................167
4.2 When 2 Units are Installed in 1 Room..................................................167
4.3 Standby Electricity Saving....................................................................168
4.4 Facility Setting Jumper (cooling at low outdoor temperature) ..............168
4.5 Jumper Settings ...................................................................................169
5. Application of Silicon Grease to a Power Transistor and
a Diode Bridge ....................................................................................170

Table of Contents

Other manuals for Daikin FTXS20K2V1B

Related product manuals