EasyManua.ls Logo

Daikin R35DV1 - Page 53

Daikin R35DV1
100 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
51
TM-FLH--0515-C
1. Remove the bottom panel and air intake grille as shown in Figure 1.
2.
Remove the terminal block cover as shown in Figure 2.
3.
Remove the control box cover as shown in Figure 3.
4.
Plug the wire pin to the control module as shown in Figure 4. Please make
sure the water pump wire is connected to (WTP) and (N1), float switch wire is
connected to (T-full).
5. Screw the Earth wire to the terminal block (E), and drain pump metal casing (E).
6.
Tie up the drain hose with cable tie t
o prevent water leaking.
7.
Mount the drain pump kit to the unit as per indicated in Figure 5.
8.
Put back the control box cover and terminal block cover.
9.
Connect the drain hose to the drain pan outlet pipe.
10.
Connect both connector for drain pump and float switch.
11.
Put back the bottom panel, air intake grille. The unit is ready to be installed.
Figure 1
Installation of Drain Pump (Ceiling Position) For FL-E

Other manuals for Daikin R35DV1

Related product manuals