Installation and operation manual
VRV IV system air conditioner
English
Installation and operation
manual
VRV IV system air conditioner
REYQ8T7Y1B
REYQ10T7Y1B
REYQ12T7Y1B
REYQ14T7Y1B
REYQ16T7Y1B
REYQ18T7Y1B
REYQ20T7Y1B
REMQ5T7Y1B

Table of Contents

Questions and Answers

  • L
    Lauren SmithSep 23, 2025
    How to fix Daikin REYQ14T7Y1B ambient temperature sensor malfunction?
    • E
      Edward LewisSep 23, 2025
      If the ambient temperature sensor is malfunctioning on your Daikin Air Conditioner, check the connection on the PCB or actuator.
  • M
    Miss Frances JenkinsAug 23, 2025
    What to do if my Daikin REYQ14T7Y1B Air Conditioner shows a low pressure malfunction?
    • J
      Jacob WernerAug 23, 2025
      If your Daikin Air Conditioner is showing a low pressure malfunction, first open the stop valves. Then, check the refrigerant level and recharge the unit if needed. Finally, inspect the user interface display and the transmission wiring between the outdoor and indoor units.
  • B
    Beth MasonAug 25, 2025
    How to fix a Daikin REYQ14T7Y1B Air Conditioner indoor unit communication error?
    • G
      Gabriel HamiltonAug 26, 2025
      If you experience an indoor unit communication error with your Daikin Air Conditioner, check the user interface connection.
  • S
    Stephanie HarrisonAug 26, 2025
    How to troubleshoot a Daikin REYQ14T7Y1B with an activated high pressure switch?
    • J
      james42Aug 27, 2025
      If the high pressure switch is activated on your Daikin Air Conditioner, check the stop valve situation and inspect for any abnormalities in the field piping or airflow over the air-cooled coil.
  • J
    Jimmy BeardAug 27, 2025
    What to do if my Daikin REYQ14T7Y1B Air Conditioner has a refrigerant overcharge or stop valve closed?
    • J
      James BarrettAug 27, 2025
      If your Daikin Air Conditioner indicates a refrigerant overcharge or a closed stop valve, check the refrigerant amount and recharge the unit if necessary. Also, ensure that the stop valves are open.
  • V
    Valerie BennettSep 17, 2025
    How to troubleshoot Daikin REYQ14T7Y1B electronic expansion valve (lower heat exchanger)?
    • W
      williamhardingSep 18, 2025
      If you are experiencing issues with the electronic expansion valve (lower heat exchanger) (Y3E) on your Daikin Air Conditioner, check the connection on the main PCB (X23A) or the actuator.
  • P
    Philip MorenoSep 14, 2025
    How to troubleshoot Daikin REYQ14T7Y1B electronic expansion valve (receiver gas)?
    • M
      Margaret SilvaSep 14, 2025
      If you are experiencing issues with the electronic expansion valve (receiver gas) (Y4E) on your Daikin Air Conditioner, check the connection on the main PCB (X25A) or the actuator.
  • B
    brettatkinsSep 15, 2025
    How to troubleshoot Daikin REYQ14T7Y1B electronic expansion valve (subcool heat exchanger)?
    • M
      Miranda FloresSep 16, 2025
      If you are experiencing issues with the electronic expansion valve (subcool heat exchanger) (Y2E) on your Daikin Air Conditioner, check the connection on the main PCB (X22A) or the actuator.
  • M
    mark44Sep 6, 2025
    What to do if stop valve closed during Daikin REYQ14T7Y1B system test run?
    • B
      Brian GonzalesSep 6, 2025
      If the stop valve is closed or wrong during the system test run of your Daikin Air Conditioner, open the stop valves.
  • K
    Kimberly DeckerSep 3, 2025
    How to open a closed liquid stop valve on a Daikin REYQ14T7Y1B?
    • J
      justin69Sep 3, 2025
      If the liquid stop valve is closed on your Daikin Air Conditioner, open the liquid stop valve.

Summary

4 Preparation

4.2 Preparing refrigerant piping

Specifications and precautions for refrigerant piping installation.

4.2.1 Refrigerant piping requirements

Specifications and precautions for refrigerant piping installation.

4.2.2 To select the piping size

Guidance on choosing the correct piping diameter based on unit capacity.

4.2.3 To select refrigerant branch kits

Procedure for selecting appropriate refrigerant branch kits.

4.2.4 Multiple outdoor units: Possible layouts

Guidelines for routing and connecting piping for multiple outdoor units.

5 Installation

5.4 Checking the refrigerant piping

Overview of procedures for checking refrigerant piping installation.

5.4.1 About checking the refrigerant piping

Overview of procedures for checking refrigerant piping installation.

5.4.2 Checking refrigerant piping: General guidelines

General guidelines for checking refrigerant piping.

5.4.3 Checking refrigerant piping: Setup

Setup procedures for checking refrigerant piping, including valve states.

5.4.4 To perform a leak test

Steps for conducting a leak test on the refrigerant piping.

5.4.5 To perform vacuum drying

Procedure for vacuum drying the refrigerant piping system.

5.6 Charging refrigerant

Safety precautions and warnings before charging refrigerant.

5.6.1 Precautions when charging refrigerant

Safety precautions and warnings before charging refrigerant.

5.6.2 About charging refrigerant

Overview of methods for charging additional refrigerant.

5.6.3 To determine the additional refrigerant amount

Method for calculating the required additional refrigerant charge.

5.6.4 To charge refrigerant: Flow chart

Flowchart illustrating refrigerant charging procedures and options.

5.6.5 To charge refrigerant

Detailed steps for charging refrigerant, including pre-charging and automatic/manual charging.

5.6.6 Step 6 a: To automatically charge refrigerant

Procedure for automatic refrigerant charging with system limitations.

5.6.7 Step 6 b: To manually charge refrigerant

Procedure for manual refrigerant charging operation.

5.6.8 Error codes when charging refrigerant

List and explanation of error codes encountered during refrigerant charging.

5.6.9 Checks after charging refrigerant

Final checks to be performed after refrigerant charging.

5.7.7 To connect the power supply

Procedure for connecting the main power supply to the unit.

6 Configuration

6.2 Using the leak detection function

Information on the automatic leak detection feature and its activation.

6.2.1 About automatic leak detection

Information on the automatic leak detection feature and its activation.

7 Commissioning

7.1 Precautions when commissioning

Important safety precautions to observe before commissioning.

7.2 Checklist before commissioning

A checklist of items to verify before starting the commissioning process.

7.3 About the test run

Overview of the test operation procedure and its objectives.

7.4 To perform a test run

Step-by-step guide for performing the system test run.

8 Troubleshooting

8.1 Solving problems based on error codes

Guide to resolving issues using malfunction codes and error tables.

8.2 Error codes: Overview

A table listing and explaining various error codes and their causes.

12 Operation

13 Maintenance and service

13.1 About the refrigerant

Information about the refrigerant type, GWP, and handling precautions.

13.2.2 Recommended maintenance and inspection

Recommendations for regular maintenance and inspection of the unit.

14 Troubleshooting

14.1 Error codes: Overview

List and explanation of error codes appearing on the user interface.

Daikin REYQ14T7Y1B Specifications

General IconGeneral
BrandDaikin
ModelREYQ14T7Y1B
CategoryAir Conditioner
LanguageEnglish

Related product manuals