EasyManua.ls Logo

Daikin REYQ12T7Y1B User Manual

Daikin REYQ12T7Y1B
44 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Installation and operation manual
VRV IV system air conditioner
English
Installation and operation
manual
VRV IV system air conditioner
REYQ8T7Y1B
REYQ10T7Y1B
REYQ12T7Y1B
REYQ14T7Y1B
REYQ16T7Y1B
REYQ18T7Y1B
REYQ20T7Y1B
REMQ5T7Y1B

Table of Contents

Questions and Answers:

Daikin REYQ12T7Y1B Specifications

General IconGeneral
BrandDaikin
ModelREYQ12T7Y1B
CategoryAir Conditioner
LanguageEnglish

Summary

About the box

Preparation

Preparing the installation site

Details requirements for selecting and preparing the installation location.

Preparing refrigerant piping

Covers the necessary preparations for refrigerant piping installation.

Refrigerant piping requirements

Specifies requirements for refrigerant piping materials and cleanliness.

To select the piping size

Guidance on selecting appropriate refrigerant pipe diameters based on capacity.

Preparing electrical wiring

Covers the necessary preparations for electrical wiring.

Safety device requirements

Outlines required safety devices for electrical installation.

Installation

Mounting the outdoor unit

Guidelines and procedures for securely mounting the outdoor unit.

Connecting the refrigerant piping

Detailed instructions for connecting the refrigerant piping system.

Checking the refrigerant piping

Procedures and guidelines for inspecting the refrigerant piping system.

To perform a leak test

Procedure for conducting leak tests on the refrigerant piping system.

To perform vacuum drying

Steps for removing moisture and air from the refrigerant piping.

Charging refrigerant

Covers the process and precautions for charging refrigerant into the system.

Precautions when charging refrigerant

Important safety and operational precautions before charging refrigerant.

To determine the additional refrigerant amount

Method for calculating the required additional refrigerant charge.

To charge refrigerant

Detailed steps for charging refrigerant, including pre-charging.

Step 6a: To automatically charge refrigerant

Procedure for performing an automatic refrigerant charge.

Step 6b: To manually charge refrigerant

Procedure for performing a manual refrigerant charge.

Connecting the electrical wiring

Covers the process of connecting field electrical wiring.

Configuration

Making field settings

Process for manually configuring system settings via the unit's PCB.

Commissioning

Precautions when commissioning

Safety warnings and critical preparation steps before commissioning.

Checklist before commissioning

List of items to verify before starting the commissioning process.

About the test run

Overview of the system test run procedure and its purpose.

To perform a test run

Step-by-step guide for executing the system's automatic test run.

Correcting after abnormal test run completion

Procedure for resolving issues identified during the test run.

Troubleshooting

Solving problems based on error codes

Procedure for diagnosing and resolving issues using error code tables.

Error codes: Overview

Reference for identifying and understanding system error codes.

Error codes: Overview

Reference table of error codes and their potential causes and solutions.

Symptoms that are NOT system malfunctions

Description of normal operational symptoms that may appear unusual.

User interface

Operation

Operating the system

General instructions on how to operate the VRV IV system.

About cooling, heating, fan only, and automatic operation

Details on different operating modes available for the system.

Using the dry program

Instructions for activating and using the humidity control dry program.

Adjusting the air flow direction

Guidance on controlling and adjusting the unit's air flow direction.

Setting the master user interface

Procedure for designating and configuring the master user interface.

Maintenance and service

Related product manuals