EasyManua.ls Logo

Daikin REYQ72 - Page 60

Daikin REYQ72
273 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SiUS39-602 Special Control
Function 49
3.1.2 Startup Control in Heating Operation
Note: ON at starting immediately after power is on.
Actuator
Pressure equalization
before start-up
Starting control
Step1 Step2
Compressor OFF 52Hz + OFF 52Hz + OFF
Outdoor unit fan STEP 4 STEP 7 STEP 7
Four way valve 1 ON ON ON
Four way valve 2 Hold Hold OFF
Main motorized valve (EV1) 0 pls 180 pls 180 pls
Sub motorized valve (EV2) 0 pls 0 pls 1000 pls
Sub-cooling motorized valve (EV3) 0 pls 0 pls 0 pls
Hot gas bypass valve (SVP) OFF ON ON
Oil equalization valve (SVO) OFF OFF OFF
Receiver gas charging valve (SVL) OFF ON ON → OFF
Receiver gas discharge valve (SVG) OFF OFF OFF → ON
Discharge pipe stop valve (SVR) Hold ON OFF → ON
Non-operating unit liquid pipe stop
valve (SVSL)
ON ON ON
High pressure gas pipe pressure
reduction valve (SVC)
Hold
*Note
OFF OFF
Ending conditions 1 min. 5 sec.
• 230 sec.
• Pc - Pe > 58 psi
or

Table of Contents