EasyManua.ls Logo

Daikin Siesta ATXM35N2V1B - Pre-Operation Setup

Daikin Siesta ATXM35N2V1B
56 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4 | Before operation
User reference guide
14
ATXM20~50N2V1B
Daikin room air conditioner
4P518786-2F – 2020.05
4 Before operation
4.1 Overview: Before operation
This chapter describes what you have to do before operating the unit.
Typical workflow
Before operation usually consist of the following stages:
Inserting the batteries in the user interface.
Fixing the user interface to the wall.
Setting the brightness of the indoor unit display.
Setting the clock.
Turning on the power supply.
4.2 To insert the batteries
The batteries will last for about 1 year.
1 Remove the front cover.
2 Insert both batteries at once.
3 Put back the front cover.
2
3
1
AAA.LR03
INFORMATION
Low energy of battery is indicated by flashing of LCD display.
ALWAYS replace both batteries at once.
4.3 To fix the user interface to the wall
cba

Table of Contents

Related product manuals